Auglaize Soil and Water Conservation District 

Home Up Events News Related Sites Search

 

 

 

 

Animal Waste
Containment Facilities
CREP Program
CRP
Windbreaks
Livestock Composting
Open Ditches
Ponds
Stop Log Structures
Tile Ditches
Waterways
Wetlands

TILE DITCHES

If you are interested in cleaning out an open ditch or replacing an old tile main.  Then feel free to contact TJ Place.  TJ can explain you the correct procedures and guide you through the process.  You can email TJ by clicking on his picture on the left.  Or contact him by phone at 419-738-4016.

T.J. Place, SWCD Ditch Coordinator/Technical Administrator

 

DITCH PROJECTS FOR BIDS

     
     
     
     

Note: The plans on this site are for viewing purposes only. 

An official copies can be picked up at the Auglaize Soil and Water Office.

 

Drainage History

Ditch Workload

Ditch Updates

Understanding Drainage

Tile Problems Caused By Tree Roots

Ohio Drainage Laws

Print Out A Ditch Petition Sheet (Request For Assistance)

 

 

 

Home ] Animal Waste ] Containment Facilities ] CREP Program ] CRP ] Windbreaks ] Livestock Composting ] Open Ditches ] Ponds ] Stop Log Structures ] [ Tile Ditches ] Waterways ] Wetlands ]